Interviews Quality Assurance Interviews:Certified Quality EngineerField Monitoring SupervisorInspector Quality AssuranceInspector Quality Assurance/QCOfficer Quality ControlQA EngineerQC OfficerQuality AnalysisQuality Assurance EngineerQuality CenterQuality Control ExecutiveRecruitment ExpertSite SupervisorSound Tester
Copyright © 2018. All Rights Reserved
Certified Quality Engineer Interview Question:
How to perform integration testing in Quality Engineering?
Submitted by: AdministratorIntegration testing is black box testing. Integration testing focuses on the interfaces between units, to make sure the units work together. For integration testing we ensure that all units testing of the each component is performed earlier. Integration testing begins only after the unit testing. The purpose of integration testing is to ensure different components of the application interact with each other. So that, components work as per the customer requirements. Test cases are developed with the purpose of exercising the interfaces between the components. Integration testing is considered complete, when actual results and expected results are same.
Submitted by:
Submitted by:
Copyright 2007-2024 by Interview Questions Answers .ORG All Rights Reserved.
https://InterviewQuestionsAnswers.ORG.
https://InterviewQuestionsAnswers.ORG.