Interviews Technical Support Engineer Interviews:Auto Body WorkerCamera TechnicianCar RepairmanCCTV Camera/ Device InstallerCCTV OperatorData Entry Operator (DEO)Die DeveloperElectric MechanicElectric Motor RepairerElectronic Media PerformersElevator TechnicianFilling Machine OperatorGenerator OperatorInstrumentationInstrumentation SpecialistLab ChemistLead GeneratorMusical Instrument MakerProduction OfficerRepairmanSharePoint DeveloperShoe MakerSolar Panel TechnicianTechnical EditorTechnical Support EngineerTechnician
Copyright © 2018. All Rights Reserved
Pad Making Machine Operator Question:
How would you estimate the weight of the Chrysler building?
Submitted by: AdministratorThis is a process guesstimate where the interviewer wants to know if you know what to ask. First, you would find out the dimensions of the building (height, weight, depth). This will allow you to determine the volume of the building. Does it taper at the top? (Yes.) Then, you need to estimate the composition of the Chrysler building. Is it mostly steel? Concrete? How much would those components weigh per square inch? Remember the extra step: find out whether you're considering the building totally empty or with office furniture, people, etc. If you're including the contents, you might have to add 20 percent or so to the building's weight.
Submitted by: Administrator
Submitted by: Administrator