Interviews Construction Job Interviews:ArchitectConstruction LaborConstruction SafetyConstruction WelderDemolition SpecialistDemolition WorkerDemonstrator PromoterDraftsmanEstimatorLeasing ConsultantProduction SupervisorProfessional ArchitectReal Estate AnalystReal Estate BrokerReal Estate DeveloperRigger /Technician
Copyright © 2018. All Rights Reserved
Construction Labor Interview Question:
List out some of the checking's, done at the completion of construction?
Submitted by: MuhammadSome of the checking done on the exterior of the construction is
☛ Utility connections
☛ Drainage
☛ Retaining walls
☛ Compaction of fill material
☛ Caulking at opening
☛ Storm sewer system
☛ Safety provision ( terraces, porches, areaways)
☛ Accessory buildings
☛ Pavement edging
☛ Protection against moisture penetration
☛ Design of dwelling structure
Submitted by: Muhammad
☛ Utility connections
☛ Drainage
☛ Retaining walls
☛ Compaction of fill material
☛ Caulking at opening
☛ Storm sewer system
☛ Safety provision ( terraces, porches, areaways)
☛ Accessory buildings
☛ Pavement edging
☛ Protection against moisture penetration
☛ Design of dwelling structure