Interview Questions Answers.ORG
Interviewer And Interviewee Guide
Interviews
Quizzes
Home
Quizzes
Interviews Technical Support Engineer Interviews:Auto Body WorkerCamera TechnicianCar RepairmanCCTV Camera/ Device InstallerCCTV OperatorData Entry Operator (DEO)Die DeveloperElectric MechanicElectric Motor RepairerElectronic Media PerformersElevator TechnicianFilling Machine OperatorGenerator OperatorInstrumentationInstrumentation SpecialistLab ChemistLead GeneratorMusical Instrument MakerProduction OfficerRepairmanSharePoint DeveloperShoe MakerSolar Panel TechnicianTechnical EditorTechnical Support EngineerTechnician
Copyright © 2018. All Rights Reserved
Generator Operator Interview Question:
Tell me why is coal crushed to a powder before being fed into a boiler?
Submitted by: MuhammadBecause if coal is not crushed the combustion will not take place and also lump coal is very dangerous for the boiler water walls.
Submitted by: Muhammad
Submitted by: Muhammad
Copyright 2007-2025 by Interview Questions Answers .ORG All Rights Reserved.
https://InterviewQuestionsAnswers.ORG.
https://InterviewQuestionsAnswers.ORG.