Interview Questions Answers.ORG
Interviewer And Interviewee Guide
Interviews
Quizzes
Home
Quizzes
Interviews Databases Programming Interviews:BtrieveClipperData ModelingData StructuresDatabase AdministrationDatabase Administrator (DBA)Database AnalystDatabase DeveloperDB DevelopmentEDI/Data Integration ExpertFirebirdHierarchicalIBM DB2InformixJava DatabaseMariaDBMicrosoft Access DeveloperMongoDBMS SQL ServerMySQL ProgrammingNetworkNoSQLObject RelationalPostgrePostgreSQLProgressRDBMSRelationalSQLSQL AdministratorSQL and PL/SQLSQL Notification ServicesSQL server 2008SSRSStored ProcedureSybaseTeradata
Copyright © 2018. All Rights Reserved
IBM DB2 Interview Question:
What are Bind concepts in DB2 cobol?
Submitted by: AdministratorThe first thing is Host languages.
Whatever we are using in cobol (other than cobol langauge
command) that are called HOST language.
DB2 is also one of the host language.
COBOL compiler does not know the host language and does not
compile the same.
we will take cobol-db2 program..
Here, we are introduce PRE-COMPILER....
Pre-compiler will spilt the cobol db2 program into two
module.
1. Cobol program (fully cobol,all the host language
commands will get replaced with "MOVE and CALL" statements.
2. DBRM (DataBast Request Module)- only those commands,
which are code within 'EXEC SQL .. END-EXEC.
Now, we have spited and we have separate for each..(COBOL
and DB2)..
We know about compilation process for COBOL.
Now come to BIND process....
Bind is nothing but, compilation process of DBRM.
The output of this compilation process(BIND) is Package.
If we bind the packages then we will get Plan/Application
plan.
When we do the link-edit the cobol program, a thread will
be created between the load module of cobol and plan.
Submitted by: Administrator
Whatever we are using in cobol (other than cobol langauge
command) that are called HOST language.
DB2 is also one of the host language.
COBOL compiler does not know the host language and does not
compile the same.
we will take cobol-db2 program..
Here, we are introduce PRE-COMPILER....
Pre-compiler will spilt the cobol db2 program into two
module.
1. Cobol program (fully cobol,all the host language
commands will get replaced with "MOVE and CALL" statements.
2. DBRM (DataBast Request Module)- only those commands,
which are code within 'EXEC SQL .. END-EXEC.
Now, we have spited and we have separate for each..(COBOL
and DB2)..
We know about compilation process for COBOL.
Now come to BIND process....
Bind is nothing but, compilation process of DBRM.
The output of this compilation process(BIND) is Package.
If we bind the packages then we will get Plan/Application
plan.
When we do the link-edit the cobol program, a thread will
be created between the load module of cobol and plan.
Submitted by: Administrator
Copyright 2007-2025 by Interview Questions Answers .ORG All Rights Reserved.
https://InterviewQuestionsAnswers.ORG.
https://InterviewQuestionsAnswers.ORG.