Interviews Quality Assurance Interviews:Certified Quality EngineerField Monitoring SupervisorInspector Quality AssuranceInspector Quality Assurance/QCOfficer Quality ControlQA EngineerQC OfficerQuality AnalysisQuality Assurance EngineerQuality CenterQuality Control ExecutiveRecruitment ExpertSite SupervisorSound Tester
Copyright © 2018. All Rights Reserved
Certified Quality Engineer Interview Question:
Which factors are responsible for estimation of system integration test cycle and total integration time?
Submitted by: Administrator★ Relative complexity of the modules.
★ Relative complexity of the interface between the modules.
★ Number of modules in the system.
★ Number of modules needed to be clustered together in each test cycle.
★ Whether the modules to be integrated have been adequately tested before.
★ Turnaround time for each test-debug-fix cycle.
Submitted by:
★ Relative complexity of the interface between the modules.
★ Number of modules in the system.
★ Number of modules needed to be clustered together in each test cycle.
★ Whether the modules to be integrated have been adequately tested before.
★ Turnaround time for each test-debug-fix cycle.