You are not logged in.
- Topics: Active | Unanswered
Pages:: 1
#1 2015-09-05 06:56:35
Schedule Test Run:
Testing Quizzes Quality Control
Question:
Dash line in the Schedule Test Run:
Option A):
It can be blue or green
Option B):
Indicates test to be executed only if the previous test has finished
Option C):
Indicates test to be executed after the previous test, with no condition
Option D):
Indicates test to be executed only if the previous test has status passed
Correct Answer is Option C):
Indicates test to be executed after the previous test, with no condition
Failure is the first step towards seccess.
Offline
2015-09-05 06:56:35
- Advertisement
- Ads By Google
Re: Schedule Test Run:
\n
Pages:: 1