Interviews Best Engineering Interviews:Aeronautical EngineeringAgricultural EngineeringApplied EngineeringAssociate EngineeringAutomobile EngineeringBio EngineeringBiomedical EngineerBiomedical EngineeringBuilding Services EngineeringCAD/CAE EngineerChemical EngineeringCivil EngineeringDAE Knitting EngineersDeputy Chief Financial OfficerDesktop EngineerDiesel MechanicElectrical EngineeringElectronics CommunicationsElectronics EngineeringEmbedded Software EngineerEnergy EngineeringEnergy Oil GasEngineeringGalvanizing EngineerIndustrial EngineeringInstrumentation EngineeringLaptop RepairerMachine Learning EngineerMachine OperatorMarine EngineeringMechanical EngineeringMechatronics EngineeringNetwork EngineerNuclear EngineeringPetroleum EngineeringPlant Reliability EngineerPlumberPre EngineeringProduction EngineerRF EngineerSystem EngineeringTextile Engineer
Copyright © 2018. All Rights Reserved
Pre Engineering Interview Question:
In reclamation works what are the importance of geotextiles and sand?
Submitted by: MuhammadThe primary purposes of geotextiles and sand in reclamation works are as follows:
☛ Geotextiles: They are used to separate the marine mud from the reclamation fill. Also geotextiles are used as reinforcements in reclamation processes to increase its stability. It is still debated as to whether the usage of geotextiles is better or are the old processes followed are better as the performance has not been comparable to the conventional methods.
☛ Sand: In reclamation process sand is used to spread the load of any future public dumps placed on top of it. Sand also acts as a drainage for the excess pore water pressure of band drain installations.
Submitted by: Muhammad
☛ Geotextiles: They are used to separate the marine mud from the reclamation fill. Also geotextiles are used as reinforcements in reclamation processes to increase its stability. It is still debated as to whether the usage of geotextiles is better or are the old processes followed are better as the performance has not been comparable to the conventional methods.
☛ Sand: In reclamation process sand is used to spread the load of any future public dumps placed on top of it. Sand also acts as a drainage for the excess pore water pressure of band drain installations.