Interviewer And Interviewee Guide

Electrical Engineering Interview Question:

Prior to using an electric saw on a construction site, a user check finds that the insulation on the supply flex is damaged. The correct procedure would be to

Submitted by: Administrator
* a) Replace the cord with a new one
* b) Report the damage to a supervisor after use
* c) Repair the cord with insulation tape
* d) Report the damage to a supervisor before use

Answer - d
Submitted by: Administrator

Read Online Electrical Engineering Job Interview Questions And Answers
Copyright 2007-2024 by Interview Questions Answers .ORG All Rights Reserved.
https://InterviewQuestionsAnswers.ORG.