Interviewer And Interviewee Guide

Chemical Engineering Interview Question:

Should slurry pipes be sloped during horizontal runs?

Submitted by: Administrator
If possible, slurry lines should indeed be sloped. Generally, to slope the pipes 1/2 inches for every 10 feet of pipe is recommended.
Submitted by: Administrator

Read Online Chemical Engineering Job Interview Questions And Answers
Copyright 2007-2024 by Interview Questions Answers .ORG All Rights Reserved.
https://InterviewQuestionsAnswers.ORG.