Interviews Best Engineering Interviews:Aeronautical EngineeringAgricultural EngineeringApplied EngineeringAssociate EngineeringAutomobile EngineeringBio EngineeringBiomedical EngineerBiomedical EngineeringBuilding Services EngineeringCAD/CAE EngineerChemical EngineeringCivil EngineeringDAE Knitting EngineersDeputy Chief Financial OfficerDesktop EngineerDiesel MechanicElectrical EngineeringElectronics CommunicationsElectronics EngineeringEmbedded Software EngineerEnergy EngineeringEnergy Oil GasEngineeringGalvanizing EngineerIndustrial EngineeringInstrumentation EngineeringLaptop RepairerMachine Learning EngineerMachine OperatorMarine EngineeringMechanical EngineeringMechatronics EngineeringNetwork EngineerNuclear EngineeringPetroleum EngineeringPlant Reliability EngineerPlumberPre EngineeringProduction EngineerRF EngineerSystem EngineeringTextile Engineer
Copyright © 2018. All Rights Reserved
Chemical Engineering Interview Question:
Should slurry pipes be sloped during horizontal runs?
Submitted by: AdministratorIf possible, slurry lines should indeed be sloped. Generally, to slope the pipes 1/2 inches for every 10 feet of pipe is recommended.
Submitted by: Administrator
Submitted by: Administrator
Copyright 2007-2024 by Interview Questions Answers .ORG All Rights Reserved.
https://InterviewQuestionsAnswers.ORG.
https://InterviewQuestionsAnswers.ORG.