Interviews Best Engineering Interviews:Aeronautical EngineeringAgricultural EngineeringApplied EngineeringAssociate EngineeringAutomobile EngineeringBio EngineeringBiomedical EngineerBiomedical EngineeringBuilding Services EngineeringCAD/CAE EngineerChemical EngineeringCivil EngineeringDAE Knitting EngineersDeputy Chief Financial OfficerDesktop EngineerDiesel MechanicElectrical EngineeringElectronics CommunicationsElectronics EngineeringEmbedded Software EngineerEnergy EngineeringEnergy Oil GasEngineeringGalvanizing EngineerIndustrial EngineeringInstrumentation EngineeringLaptop RepairerMachine Learning EngineerMachine OperatorMarine EngineeringMechanical EngineeringMechatronics EngineeringNetwork EngineerNuclear EngineeringPetroleum EngineeringPlant Reliability EngineerPlumberPre EngineeringProduction EngineerRF EngineerSystem EngineeringTextile Engineer
Copyright © 2018. All Rights Reserved
Pre Engineering Interview Question:
Tell me during reclamation how can the occurrence of mud waves can be rectified?
Submitted by: MuhammadThere are several solution to the rectification of the problem of mud waves:
☛ Complete removal of all the disturbed mud: This method can be considered to be one of the fastest methods. As soon as the disturbed mud is removed some filling material is used to replace the disturbed mud. But economically this method can be expensive as compared to others.
☛ Accelerated consolidation of disturbed mud: In this method surcharging loads are placed on top of the mud waves. Along with this band drains are installed to accelerate the consolidation process. This method is quite slow compared to the other methods.
☛ Partial removal of the disturbed mud: This method is the hybrid of the above two methods where the top layer is removed whereas the lower level is treated with the surcharging process.
Submitted by: Muhammad
☛ Complete removal of all the disturbed mud: This method can be considered to be one of the fastest methods. As soon as the disturbed mud is removed some filling material is used to replace the disturbed mud. But economically this method can be expensive as compared to others.
☛ Accelerated consolidation of disturbed mud: In this method surcharging loads are placed on top of the mud waves. Along with this band drains are installed to accelerate the consolidation process. This method is quite slow compared to the other methods.
☛ Partial removal of the disturbed mud: This method is the hybrid of the above two methods where the top layer is removed whereas the lower level is treated with the surcharging process.
Submitted by: Muhammad