Interviews Application Program Interviews:AutoCADBEA WeblogicBioinformaticsBizTalk ServerBug Tracking ToolsBugzillaClarify CRMCoding StandardsComputer Aided Design (CAD) DesignerCVSGIMPJMXLINQLoadRunnerMagentoMATLABMicrosoft AccessMicrosoft ExcelMicrosoft OfficeMicrosoft OutlookMicrosoft WordModel View Controller (MVC)OLAPOOADQuickbookRational RobotRDFSchemaSiebelSilkTestSVGTest PlanTesting ToolsUnity 3D DeveloperVRMLWCF SDKWPFXML DOMXPointer
Copyright © 2018. All Rights Reserved
LoadRunner Interview Question:
What is think time? How do you change the threshold?
Submitted by: AdministratorThink time is the time that a real user waits between actions. Example: When a user receives data from a server, the user may wait several seconds to review the data before responding. This delay is known as the think time. Changing the Threshold: Threshold level is the level below which the recorded think time will be ignored. The default value is five (5) seconds. We can change the think time threshold in the Recording options of the Vugen.
Submitted by: Administrator
Submitted by: Administrator
Copyright 2007-2024 by Interview Questions Answers .ORG All Rights Reserved.
https://InterviewQuestionsAnswers.ORG.
https://InterviewQuestionsAnswers.ORG.