Interviews Designing Interviews:2D Artist2D Game Graphic Designer3-D Animation3D Artist3D Game Modeler3D Graphics3D Illustrator3D Interior Designer3D Maya3D ModelingAssistant Design EngineerAutomobile DesignerDesign EngineerFashion DesignerFreelance Textile DesignerItalian Kitchen DesignerLogo DesignerMobile Apps DesignerPhysical Product DesignerProduct DesignerTextile Dyeing SpecialistUX DesignerWeb Designing
Copyright © 2018. All Rights Reserved
Italian Kitchen Designer Interview Question:
Tell us what is the timeline for the whole kitchen design process?
Submitted by: MuhammadA lot of people do not understand the amount of time needed for a kitchen remodel. Depending on the scope of the work needed, it can take between 4 to 6 months…and that is, if you have already done all of your shopping and planning and everything has been ordered. It can be a year or more if you are still at the very beginning stages and you still need to have the space designed, pick all of the fixtures, finishes, etc. Also, keep in mind that orders of European cabinets will take longer due to the overseas shipping. The important thing is to know the timeline for each phase of the project so you can plan ahead and ensure smooth sailing.
Submitted by: Muhammad
Submitted by: Muhammad