What is linking Defect to test in Quality Control?

Submitted by: Muhammad
Defects can be linked to test in the defect grid. It helps to run the tests based on the status of the defect. Defects can be linked to other entities as well such as requirements. Linking can be direct or indirect. If the defect link is with entity then QC adds a direct link and if the link is with run step then QC adds an indirect link to its run, test instance, test set and test.
Submitted by: Muhammad

Read Online Quality Center Job Interview Questions And Answers