Tell me how do you determine the correct installation of flow orifice?
Submitted by: MuhammadThe orifice data (tag) shall be punched in the up stream of orifice , the data (tag) side shall be in the upstream of flow direction.
Submitted by: Muhammad
Submitted by: Muhammad