If a load is to be winched across a flat concrete floor, it should be placed on a skid which has ___ on its underneath side to provide the least friction.
a. aluminum
b. wood
c. steel
d. rubber
Submitted by: Muhammadb. wood
Submitted by: Muhammad
Submitted by: Muhammad
Read Online Rigger /Technician Job Interview Questions And Answers
Top Rigger /Technician Questions
☺ | Why do you want this job as Rigger/Technician? |
☺ | A snail is at the bottom of a 30-foot well. Each day he climbs up three feet, but at night he slips back two feet. How many days will it take him to climb out of the well? |
☺ | Out of all the other candidates, why should we hire you? |
☺ | Explain me what really drives results in this job? |
☺ | What do you consider to be your biggest professional achievement? |
Top Construction Job Categories
☺ | Draftsman Interview Questions. |
☺ | Rigger /Technician Interview Questions. |
☺ | Construction Safety Interview Questions. |
☺ | Production Supervisor Interview Questions. |
☺ | Real Estate Analyst Interview Questions. |