1. What are the costing parameter?

The costing Parameters are the following

Work center : Activity types and the formulaes,cost center

Routing : the time ,activity types

In Production order dependent parameters we are defining
the Variant ,result analysis key,settlement profile

In the controlling i.e in KP 26 we will be defining the
rates per hour depending on the rates it will reflect the
cost caluculating from the routing..

2. What is the difference between stock transfer order and stock transport order?

Stock transfer is the transfer of stock for the usage in the
same company

whereas stock transport is meant for change of title of
stock in the name of the buyer

3. Tell me the planning steps for 100 products?

CK11n is used for standard cost estimation.
to run that we have to run ck24 also.


Use CK40N f0r 100 products

4. What we will do after the marking and
releasing of standard price in product costing?

Price update and the same reflects in the accounting view
of the material master.

5. Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?

yes you can have several alternative BOMs for a material,
only thing is you need to define every BOM with deiffrent
product structure type.

6. Do you have products with a large number of variants? Do you need Variant Configuration?

We can have any number of varaint product. It is optional
you can configurate it or at the timne of slaes order with
will be ask for features and options. Every varraint has
unique indentificatin number.

7. Which BOM maintenance functions do you require (copy functions, mass changes, and so on)?

CS20 with this transaction code we can able to do Mass
changes to BOM
such as:Change Item Data
New material
Number of the material that is to be created or that is to
replace another material.

Dependencies
You can only replace a material with another material that
has the same values in the following fields:

base unit of measure
issue unit
material type

8. What structure do your BOMs have? How many levels are there?
How many components are there on each level?

BOM IS A multilevel,
we can assign bom level by level cs11,
level 1 bom header material assembly level,
contains components which also have bom contains
level 2 bom sub assembly level
last lower level is
level 3 components level

9. Do you have different BOMs for a material in different plants?

generally we have following BOMs
1.Product Tree
2. Parent- component relationship
3. Multilevel Bill
4.Multiple Bill
5. Single Level Bill
6. Indented bill
7. Summarized parts list
8. Planning bill
9. where- used report
10. Pegging report