Is standard cost estimate with
out quantity structure, and what is the configuration settings for that?

Submitted by: Administrator
A cost estimate without qty structure is the KKPAN, its a
manual cost estimate and does not use the work center
routing scenarios that exist with a qty structure.
the config settings, are cost component structure the
costing variant, and possibly the costing sheet if that was
required.
Submitted by: Administrator

Read Online SAP FI CO Job Interview Questions And Answers