Main boring diameter for petroleum well is 20-30 cms in diameter, while the depth of the oil well may be about __________ kms.
A. 0.1 to 0.5
B. 1.5 to 4.5
C. 7.5 to 12.5
D. 15-20
Submitted by: MuhammadOption B
Submitted by: Muhammad
Submitted by: Muhammad
Read Online Petroleum Engineering Job Interview Questions And Answers
Top Petroleum Engineering Questions
☺ | Pour point and freezing point is equal for |
☺ | Complete removal of __________ from gasoline is done by Unisol process using caustic soda and methyl alcohol. |
☺ | Name the hydrocarbon having the poorest oxidation stability. |
☺ | Smoke point of a test sample of kerosene is found to be 15 mm. On removal of __________ from it, the smoke point rises to 25 mm. |
Top Best Engineering Categories
☺ | Mechanical Engineering Interview Questions. |
☺ | Civil Engineering Interview Questions. |
☺ | Chemical Engineering Interview Questions. |
☺ | Electrical Engineering Interview Questions. |
☺ | Automobile Engineering Interview Questions. |