D. Chief Engineer
2. Performance of a specific task in CPM, is known:
A. Dummy
B. Event
C. Activity
D. Contract
C. Activity
E. all the above
D. all the above
A. line organisation
D. All the above
E. All the above
C. The activity which consumes maximum time, is called a node
B. horizontal lines
A. instructions by the executive engineers
20. Critical path lies along activities having total float:
A. positive
B. negative
C. zero
D. same
C. zero
A. Rs. 25,000
C. free float