1. Bar charts are suitables for:
A. minor works
B. major works
C. large projects
D. all the Above
A. minor works
C. minor projects
D. all the above
A. Rs. 25,000
17. Critical path lies along activities having total float:
A. positive
B. negative
C. zero
D. same
C. zero
A. instructions by the executive engineers
B. horizontal lines
C. The activity which consumes maximum time, is called a node
D. All the above
A. line organisation
D. all the above
E. all the above