In an operating system, processes A / B / C have the following maximum designed capacity - A = 1600 units / B = 1550 units / C = 1800 units. If the actual measured output is 1400 units, what is the system efficiency?

Submitted by: Administrator
1. 95%
2. 75%
3. 85%
4. 90%
5. 105%

90%