In an operating system, processes A / B / C have the following maximum designed capacity - A = 1600 units / B = 1550 units / C = 1800 units. If the actual measured output is 1400 units, what is the system efficiency?
Submitted by: Administrator1. 95%
2. 75%
3. 85%
4. 90%
5. 105%
90%
Submitted by: Administrator
2. 75%
3. 85%
4. 90%
5. 105%
90%
Submitted by: Administrator
Read Online Capacitor Planning Job Interview Questions And Answers
Top Capacitor Planning Questions
☺ | The first steps of capacity planning and control do not include? |
☺ | The maximum output of a system in a given period is called? |
☺ | What is meant by yield management? |
☺ | The most favorable solution to non-uniform demand is probably to? |
Top Basic Professional Categories
☺ | Electrician Interview Questions. |
☺ | Agriculture Interview Questions. |
☺ | Cabin Crew Interview Questions. |
☺ | Police Officer Interview Questions. |
☺ | Firefighter Interview Questions. |