2. Performance of specific task in CPM, is known:
A. Dummy
B. Event
C. Activity
D. Contract
C. Activity
E. all the above
B. Critical ratio scheduling
D. The arrows are drawn to scale from left to right
2. Performance of specific task in CPM, is known:
A. Dummy
B. Event
C. Activity
D. Contract
C. Activity
E. all the above
B. Critical ratio scheduling
D. The arrows are drawn to scale from left to right