2. Performance of specific task in CPM, is known:
A. Dummy
B. Event
C. Activity
D. Contract
C. Activity
E. all the above
B. Critical ratio scheduling
D. The arrows are drawn to scale from left to right
9. Cost of project is more than:
A. one lac
B. two lacs
C. three lacs
D. four lacs
E. five lacs.
A. one lac
D. All the above
D. Chief Engineer
B. horizontal lines
A. line organisation
C. The activity which consumes maximum time, is called a node
D. all the above.
31. Estimated time required to perform activity, is known as:
A. event
B. dummy
C. duration
D. float
C. duration
A. instructions by the executive engineers